Nonstop flight route between St. John's, Newfoundland and Labrador, Canada and Kuching, Sarawak, Malaysia:
Departure Airport:
Arrival Airport:
Distance from YYT to KCH:
Share this route:
Jump to:
- About this route
- YYT Airport Information
- KCH Airport Information
- Facts about YYT
- Facts about KCH
- Map of Nearest Airports to YYT
- List of Nearest Airports to YYT
- Map of Furthest Airports from YYT
- List of Furthest Airports from YYT
- Map of Nearest Airports to KCH
- List of Nearest Airports to KCH
- Map of Furthest Airports from KCH
- List of Furthest Airports from KCH
About this route:
A direct, nonstop flight between St. John's International Airport (YYT), St. John's, Newfoundland and Labrador, Canada and Kuching International Airport (KCH), Kuching, Sarawak, Malaysia would travel a Great Circle distance of 8,827 miles (or 14,206 kilometers).
A Great Circle is the shortest distance between 2 points on a sphere. Because most world maps are flat (but the Earth is round), the route of the shortest distance between 2 points on the Earth will often appear curved when viewed on a flat map, especially for long distances. If you were to simply draw a straight line on a flat map and measure a very long distance, it would likely be much further than if you were to lay a string between those two points on a globe. Because of the large distance between St. John's International Airport and Kuching International Airport, the route shown on this map most likely appears curved because of this reason.
Try it at home! Get a globe and tightly lay a string between St. John's International Airport and Kuching International Airport. You'll see that it will travel the same route of the red line on this map!
Departure Airport Information:
IATA / ICAO Codes: | YYT / CYYT |
Airport Name: | St. John's International Airport |
Location: | St. John's, Newfoundland and Labrador, Canada |
GPS Coordinates: | 47°37'6"N by 52°45'8"W |
Area Served: | St. John's, Newfoundland and Labrador |
Operator/Owner: | Transport Canada |
Airport Type: | Public |
Elevation: | 461 feet (141 meters) |
# of Runways: | 3 |
View all routes: | Routes from YYT |
More Information: | YYT Maps & Info |
Arrival Airport Information:
IATA / ICAO Codes: | KCH / WBGG |
Airport Names: |
|
Location: | Kuching, Sarawak, Malaysia |
GPS Coordinates: | 2°29'4"N by 110°20'16"E |
Area Served: | Kuching Division & Samarahan Division, Sarawak, East Malaysia |
Operator/Owner: | Government of Malaysia |
Airport Type: | Military/Public |
Elevation: | 89 feet (27 meters) |
# of Runways: | 1 |
View all routes: | Routes from KCH |
More Information: | KCH Maps & Info |
Facts about St. John's International Airport (YYT):
- The control tower originally constructed during the war burned down in an extensive fire at the airport on March 17, 1946, which caused $1.5 million worth of damage.
- The closest airport to St. John's International Airport (YYT) is Gander International Airport (YQX), which is located 124 miles (199 kilometers) NW of YYT.
- St. John's International Airport (YYT) has 3 runways.
- The furthest airport from St. John's International Airport (YYT) is Portland Airport (PTJ), which is located 11,475 miles (18,467 kilometers) away in Portland, Victoria, Australia.
- The following fixed base operators are based at St.
- The airport is classified as an airport of entry by NAV CANADA and is staffed by the Canada Border Services Agency.
- On October 18, 1941, three American B-17 Flying Fortress and one RCAF Digby made the first unofficial landing on the only serviceable runway available.
- St. John's International Airport handled 1,318,713 passengers last year.
- Because of St. John's International Airport's relatively low elevation of 461 feet, planes can take off or land at St. John's International Airport at a lower air speed than at airports located at a higher elevation. This is because the air density is higher closer to sea level than it would otherwise be at higher elevations.
Facts about Kuching International Airport (KCH):
- Kuching International Airport was given a radical makeover, with the terminal completed in 2006 and the runway and taxiway extension fully completed in 2008.
- Kuching International Airport (KCH) currently has only 1 runway.
- In 1962, the runway was extended once more to a length of 1921 meters to facilitate DeHavilland Comet-4 turbojet aircraft operations.
- Because of Kuching International Airport's relatively low elevation of 89 feet, planes can take off or land at Kuching International Airport at a lower air speed than at airports located at a higher elevation. This is because the air density is higher closer to sea level than it would otherwise be at higher elevations.
- The furthest airport from Kuching International Airport (KCH) is Ipiranga Airport (IPG), which is nearly antipodal to Kuching International Airport (meaning Kuching International Airport is almost on the exact opposite side of the Earth from Ipiranga Airport), and is located 12,406 miles (19,965 kilometers) away in Santo Antônio do Içá, Amazonas, Brazil.
- In 1971, the Malaysian Government engaged a team of Canadian Consultants to make a Master Plan study of Kuching International Airport.
- No city buses are available at the moment.
- KIA is the secondary hub for Malaysia Airlines and has been growing rapidly to tackle the demand of the travellers in the East Malaysia region.
- In addition to being known as "Kuching International Airport", another name for KCH is "Lapangan Terbang Antarabangsa Kuching 古晋国际机场".
- Kuching International Airport handled 4,871,036 passengers last year.
- The closest airport to Kuching International Airport (KCH) is Sematan Airport (BSE), which is located 61 miles (98 kilometers) SW of KCH.
- In 1980, consistent with the advent of Airbus A300B4 operations, it was imperative that the runway pavement strength be upgraded to meet the requirements of that particular aircraft.
- Malaysia Airlines in Kuching International Airport has so far achieved a zero accident rate in 2006.
- The airport terminal is capable of handling five million passengers per annum and it is the fourth busiest airport in Malaysia.
- Construction of the terminal complex at the north site took a centre stage at the end of 1978 and was completed in July 1983.